Why used Planning tools like APO or I2? |
Why used Planning tools like APO or I2?
APO and I2 are Finite PLANNING tools. When MRP runs with APO or I2 (or Red Pepper or Manugistics), it takes Capacity issues (10/15/2006 16:58:12,112) [查看全文] |
What exactly is a Phantom item or Assembly means? |
Can anyone plese tell me what exactly is a phantom item or assembly means? How does it affect the MRP process?
A phantom assembly is used when you want to be able(09/17/2006 21:24:09,231) [查看全文] |
Multi-level configuration with variants |
-----Original Message----- Subject: Multilevelconfiguration with variants
Hi all,
Does anybody know a trick to use preconfigured variants in mulitilevel configuration ?
(09/17/2006 21:23:44,151) [查看全文] |
Mass Change Bill of Materials |
Use Transaction CS20 to mass change your BOM.
In this transaction code, you can :-
1. mass change item data 2. mass delete items (09/17/2006 21:23:24,160) [查看全文] |
Allocating BOM to Other Plant |
Use Transaction CS07 to link this BOM to the other plants.
This shall make the BOM available in the other plants.
(09/17/2006 21:23:02,125) [查看全文] |
Controlling data for your Bill of Materials |
You define the default values for BOM in OS28. - Based quantity - BOM Status - Size Unit - Var-size item unit You control the M(09/17/2006 21:22:37,167) [查看全文] |
Where used list for BOM |
Transaction code : CS15
First screen :
Material (09/17/2006 21:22:15,150) [查看全文] |
Explode BOM |
Transaction code :
CS11 to explode BOM level by level
CS12 to explode BOM Multi level
(09/17/2006 21:21:54,149) [查看全文] |
Creating a simple BOM |
Transaction code : CS01
Material : Your Material code
Plant : Y(09/17/2006 21:21:26,119) [查看全文] |
When is a Material BOM Not Exploded? |
A BOM is not exploded in the following situations:
- No BOM is effective: -- On the explosion date and in the given area of validity For the given effectivity parameters
(09/17/2006 21:20:57,115) [查看全文] |
How to link BOM component to storage location? |
If you have to issue a component for production order of main item always from a specific storage location (component is stored in multiple storage locations but for production of a top item reservations should be created only on a (09/17/2006 21:19:50,134) [查看全文] |