Lose of link between sales order and production order |
Issue with production order confirmation
Due to lose of link between(10/15/2006 17:05:07,116) [查看全文] |
How to Configure Range Of Coverage Profile |
I am trying to configure the range of coverage profile to provide a 6 months safety stock, in which the 'target cov' field should be populated with 180 days, but the that fiel(10/15/2006 17:04:47,146) [查看全文] |
Reservation Not Created During MRP Run |
I have created a planned order thro MRP run, but reservation for raw material is not created, even (10/15/2006 17:04:04,115) [查看全文] |
MRP Monthly lot size |
MRP Monthly lot size
Appreciated if some guide can be provided. MRP lot size has been set to MB (Monthly l(10/15/2006 17:03:37,244) [查看全文] |
[推荐]Planning Strategy Selection |
Planning Strategy Selection
Selection priority for planning strategy is:
First material, second MRP group and last plant parameters. E.g. System first ch(10/15/2006 17:03:13,209) [查看全文] |
Why Planning file entry still Exists? |
Why Planning file entry still Exists?
(10/15/2006 17:02:47,137) [查看全文] |
PP - The Common Planning Strategy used |
PP - The Common Planning Strategy used
The planning strategies are maintained in Customizing for Demand Management in
(10/15/2006 17:02:22,269) [查看全文] |
Planning separately via Storage Location or Vendor with MRP Area |
Planning separately via Storage Location or Vendor with MRP Area(10/15/2006 17:01:54,171) [查看全文] |
Questions on MRP Group and MRP Controller |
Questions on MRP Group and MRP Controller
MRP groups are used when the plant division for planning is not enough for the division of the different materials MRP req(10/15/2006 17:01:36,228) [查看全文] |
Define Safety Stock Availability |
Define Safety Stock Availability
The IMG can be set in SM30 - V_438M_S(10/15/2006 17:01:23,141) [查看全文] |
Purchasing processing Time - OPPQ |
Purchasing processing Time - OPPQ
Please refer above subject and would like to do following. External Processing Time I have set in using OPPQ. My client w(10/15/2006 17:00:50,113) [查看全文] |
Calculation to determine the delivery date and release date |
Calculation to determine the delivery date and release date
There have been three parameters that SAP will take it into calculation to determine the delivery date a(10/15/2006 17:00:05,124) [查看全文] |
GR processing time in PP and MM |
GR processing time in PP and MM
I have one material number that is procured externally but also produced inhouse. Now I have one problem with the GR proces(10/15/2006 16:59:44,176) [查看全文] |
SAP Factory Calendar |
SAP Factory Calendar
Factory calendar contain company specific dates such as alternate working Saturdays, Plant shutdown etc.
You can create your company(10/15/2006 16:59:20,177) [查看全文] |
Difference between MRP vs MPS |
Explain the difference between MRP & MPS. Though both components gives you the requirement (10/15/2006 16:59:00,146) [查看全文] |