生产(PP)  
 *Stock in Transit - liquidation or remove the stock which is in transit
I am transfering a product from one plant (say 1000) to another plant (say 2000).  By using MB5T, I could find the stock in transit.  Unfortunately, the lorry met with a fire accident and all my goods destroyed.
(10/18/2006 08:29:40,162) [查看全文]
 *Goods receipt and goods issue through a PI sheet
Can anyone explain to me how the goods issue and goods receipt are done through a PI sheet.  What's the logic behind calling the functional module.
(10/18/2006 08:29:27,214) [查看全文]
 *Goods Receipt (101) for Process Order
We are currently working on SAP 4.7.
Currently experiencing a problem where the Goods Receipt (101) for Process order is taking place befo
(10/18/2006 08:28:57,229) [查看全文]
 *Serial Number For Component
I have a FG (A/C) which has a serial number. This A/c has a compressor in its BOM.
The client requirement is to link the compressor to A/c using serial number. So, I maintain serial number profile for t
(10/18/2006 08:25:59,426) [查看全文]
 *SAP flow for REWORK activity
Question:
What is the SAP flow for REWORK activity in PP-PI.
Sample Scenerio:
1. Initial Process Order qty: 10pc
2
(10/18/2006 08:25:36,220) [查看全文]
 *How Costing takes place in Production Orders
Can anyone please explain me the how the Costing takes place for the Production Orders.
(10/18/2006 08:25:21,155) [查看全文]
 *What is Backflushing?
Can anyone tell me what is backflushing for? When is it use? 
Back flushing is nothing but automatic goods issue. System will automatically posts the goods issue when you confirm the operations.You have
(10/18/2006 08:24:29,187) [查看全文]
 *Production order confirmation with future date is not allowed
Future dates can be configured in the confirmation configuration. 
In configuration OPK4, define confirmation parameters. 
When this configurat
(10/18/2006 08:24:13,165) [查看全文]
 *Automatic Conversion to Production Orders
Is there anyone out there who knows if it is possible to make an automatic change of planned orders to production orders right away - or perhaps even to skip the planned orders and create pp - orders instead? 
(10/18/2006 08:23:53,118) [查看全文]
 *Material Stock in Production Order
I have the problem in stock against production order:
Our scenario is we don’t want to create a sales order. I create a production order that has 5 operations. The first operation is sub con
(10/18/2006 08:23:29,139) [查看全文]
 *Production Setup Time
My client has a production setup where there is a particular activity which has a setup time of 8 hrs when it is executed for the first time, but if another production order is taken up for the same material then the set up rime is
(10/18/2006 08:22:41,192) [查看全文]
 *What is Discrete Manufacturing, REM and Demand Management?

What is Discrete Manufacturing, REM and Demand Management?
(10/15/2006 17:06:27,144) [查看全文]
 *Functions of Production Version
Functions of Production Version
Can somebody enlighten me on the functions of production version and some tips on its configurati
(10/15/2006 17:06:05,155) [查看全文]
 *What is Firming Type in the MRP Types
 
The firming type dictates the behavior of planning with PTR (Planning Time Fence), i.e whether the system should automatically firm the unfirmed
(10/15/2006 17:05:48,156) [查看全文]
 *Batch Characteristics while Running MRP
Can batch characteristics be considered while running a MRP? I have a fin
(10/15/2006 17:05:27,100) [查看全文]
首页 | 前页 | 后页 | 尾页分页 3/5  [1] [2] [3] [4] [5]  
网站搜索:
 
文章分类
生产(PP) (69)
  物料清单 (15)
  需求计划 (24)
  计划订单 (1)
  生产订单 (10)
  其它 (15)