 库位是否参与MRP运算 |
设置库位是否参与MRP预算,可以在IMG:Production -> Material Requirements Planning -(01/07/2007 14:17:12,272) [查看全文] |
SAP BOM的读取逻辑 |
1 Search Material, Plant and Material Description. Read the material number, plant and material description from join of MARA, MARC and MAKT using the following conditions:(11/05/2006 20:34:11,792) [查看全文] |
Bill Of Material 物料清单 |
A bill of material is a complete, formally structured list of the components of a product or assembly.
A bill of material contains the description of e(11/05/2006 20:17:45,563) [查看全文] |
工艺与工作中心 Routing & Work Center |
Routing: 是从纯技术的角度(抽象的角度)讨论物料的加工和产品的生成,不涉及到由谁加工,在哪里技工,在哪台机器上加工。
生产每一种特定产品就有一个特定的Routing, 生产同一大类产品或物料得所有Routing 或者生产同一产品和物料因不同的批量而需要
的多个Routing, 这些Routing可以组成一个组 A routing group.
Each(11/05/2006 20:14:51,430) [查看全文] |
面向装配订单生产的Business Scenario |
500)this.style.widt(11/05/2006 20:05:49,304) [查看全文] |
物料的移动(goods movement) |
物料的移动的几大类Movement Type(大类还有明细类): 1,goods receipt(接收物料) 2,goods issues(发送物料) 3,tran(11/05/2006 19:57:25,407) [查看全文] |
(2) 计划订单--Production Planning |
Production Planning is the process of using forecast and customer demand to create productin and procurement shedules for fin(11/05/2006 19:47:20,371) [查看全文] |
生产订单执行过程 Production Order Execution Process |
Using MRP, planned independent requirements(独立需求计划,如customer order for motorcycle) in SD become the BOM components required t(11/05/2006 19:46:20,496) [查看全文] |
生产订单与主数据的集成 PO&&Master data |
Production orders are used: 1, To control and monitor production within a factor(11/05/2006 19:44:21,296) [查看全文] |
(5) 生产订单确认---Production Order Confirmations |
Production order confirmations (sometimes called completion confirmations) are used to record intern(11/05/2006 19:43:07,318) [查看全文] |
生产排程综述 |
做什么都需要计划,制造企业的生产更是如此。企业做出销售预测,或是接到客户订单时,必须快速做出反映,能不能在要求的期间内完成订单,在什么时候完成,完成订单需要哪些物料,库存情况怎样,哪些需要购买,哪些自已生产,在生产之前材料是否能准时到达工厂。企业内部的生产能力是否足够,是否需要协力厂商帮助。完成订单购买材料应该向哪个供应商订购,供应商的交期多长,企业应该在什么时候下订购单,需(10/30/2006 18:47:22,390) [查看全文] |
主生产计划MPS |
(10/30/2006 18:45:32,424) [查看全文] |
工作中心 |
、工作中心简介
(10/30/2006 18:44:12,319) [查看全文] |
Production Planning - Production Control System Messages |
You can manage the production control system messages with transaction OPJB. (10/18/2006 08:30:19,228) [查看全文] |
Steps for Subcontracting |
Like to share with you my Subcontracting Steps:
1. Define all the materials in your plant (subcontracting and packaging etc).
2. In the material master MRP 4 view there is one field in which you can (10/18/2006 08:30:06,171) [查看全文] |