生产订单  
 fixed[注意]如何获取积分?
首先感谢大家的光临。
本站建立的初衷就是为了给大家提供一个查看文档、交流并共同维护、进步的地方.
现在网站已经初具规模了,为了推动网站的壮大,并加强同行间的交流,对于部分精品进行积分考虑。
具体如下:
1、新注册用户 积分为:10
2、发表文章、上传文件 每篇积分为:5
(12/28/2006 15:09:26,429) [查看全文]
 *生产订单执行过程 Production Order Execution Process
Using MRP, planned independent requirements(独立需求计划,如customer order for motorcycle)
in SD become the BOM components required t
(11/05/2006 19:46:20,134) [查看全文]
 *生产订单与主数据的集成 PO&&Master data
Production orders are used:
1, To control and monitor production within a factor
(11/05/2006 19:44:21,123) [查看全文]
 *Serial Number For Component
I have a FG (A/C) which has a serial number. This A/c has a compressor in its BOM.
The client requirement is to link the compressor to A/c using serial number. So, I maintain serial number profile for t
(10/18/2006 08:25:59,312) [查看全文]
 *SAP flow for REWORK activity
Question:
What is the SAP flow for REWORK activity in PP-PI.
Sample Scenerio:
1. Initial Process Order qty: 10pc
2
(10/18/2006 08:25:36,64) [查看全文]
 *How Costing takes place in Production Orders
Can anyone please explain me the how the Costing takes place for the Production Orders.
(10/18/2006 08:25:21,42) [查看全文]
 *What is Backflushing?
Can anyone tell me what is backflushing for? When is it use? 
Back flushing is nothing but automatic goods issue. System will automatically posts the goods issue when you confirm the operations.You have
(10/18/2006 08:24:29,47) [查看全文]
 *Production order confirmation with future date is not allowed
Future dates can be configured in the confirmation configuration. 
In configuration OPK4, define confirmation parameters. 
When this configurat
(10/18/2006 08:24:13,41) [查看全文]
 *Automatic Conversion to Production Orders
Is there anyone out there who knows if it is possible to make an automatic change of planned orders to production orders right away - or perhaps even to skip the planned orders and create pp - orders instead? 
(10/18/2006 08:23:53,38) [查看全文]
 *Material Stock in Production Order
I have the problem in stock against production order:
Our scenario is we don’t want to create a sales order. I create a production order that has 5 operations. The first operation is sub con
(10/18/2006 08:23:29,40) [查看全文]
 *Production Setup Time
My client has a production setup where there is a particular activity which has a setup time of 8 hrs when it is executed for the first time, but if another production order is taken up for the same material then the set up rime is
(10/18/2006 08:22:41,55) [查看全文]
首页 | 前页 | 后页 | 尾页分页 1/1  [1]  
网站搜索:
 
文章分类
生产(PP) (59)
  物料清单 (12)
  需求计划 (22)
  计划订单 (1)
  生产订单 (10)
  其它 (14)