需求计划  
 fixed[注意]如何获取积分?
首先感谢大家的光临。
本站建立的初衷就是为了给大家提供一个查看文档、交流并共同维护、进步的地方.
现在网站已经初具规模了,为了推动网站的壮大,并加强同行间的交流,对于部分精品进行积分考虑。
具体如下:
1、新注册用户 积分为:10
2、发表文章、上传文件 每篇积分为:5
(12/28/2006 15:09:26,1034) [查看全文]
 *40策略帮助文件
40
(今 09:51,0) [查看全文]
 *mrp mps
upload/2008_03/08033114509546.rar
(04月01日,12) [查看全文]
 *限会员关于MRP的几个概念
ABC Classification ABC分类法
对于库存的所有物料,按照全年货币价值从大到小排序,然后划分为三大类,分别称为A类、B类和C类。A类物料价值最高,受到高度重视,处于中间的B类物料受重视程度稍差,而C类物料价值低,仅进行例行控制管理。ABC分类的原则是通过放松对低值物料的控制管理而节省精力,从而可以把高值物料的库存管理做得更
(01/24/2007 16:51:00,1) [查看全文]
 *限会员库位是否参与MRP运算
设置库位是否参与MRP预算,可以在IMG:Production -> Material Requirements Planning -
(01/07/2007 14:17:12,214) [查看全文]
 *What is Discrete Manufacturing, REM and Demand Management?

What is Discrete Manufacturing, REM and Demand Management?
(10/15/2006 17:06:27,118) [查看全文]
 *Functions of Production Version
Functions of Production Version
Can somebody enlighten me on the functions of production version and some tips on its configurati
(10/15/2006 17:06:05,128) [查看全文]
 *What is Firming Type in the MRP Types
 
The firming type dictates the behavior of planning with PTR (Planning Time Fence), i.e whether the system should automatically firm the unfirmed
(10/15/2006 17:05:48,117) [查看全文]
 *Batch Characteristics while Running MRP
Can batch characteristics be considered while running a MRP? I have a fin
(10/15/2006 17:05:27,82) [查看全文]
 *Lose of link between sales order and production order
Issue with production order confirmation
Due to lose of link between
(10/15/2006 17:05:07,98) [查看全文]
 *How to Configure Range Of Coverage Profile

I am trying to configure the range of coverage profile to provide a 6 months safety stock, in which the 'target cov' field should be populated with 180 days, but the that fiel
(10/15/2006 17:04:47,117) [查看全文]
 *Reservation Not Created During MRP Run
I have created a planned order thro MRP run, but reservation for raw material is not created, even
(10/15/2006 17:04:04,91) [查看全文]
 *MRP Monthly lot size
MRP Monthly lot size
Appreciated if some guide can be provided.  
MRP lot size has been set to MB (Monthly l
(10/15/2006 17:03:37,184) [查看全文]
 *[推荐]Planning Strategy Selection
Planning Strategy Selection
Selection priority for planning strategy is:
First material, second MRP group and last plant parameters. E.g. System first ch
(10/15/2006 17:03:13,166) [查看全文]
 *Why Planning file entry still Exists?

Why Planning file entry still Exists?
(10/15/2006 17:02:47,106) [查看全文]
首页 | 前页 | 后页 | 尾页分页 1/2  [1] [2]  
网站搜索:
 
文章分类
生产(PP) (66)
  物料清单 (13)
  需求计划 (24)
  计划订单 (1)
  生产订单 (10)
  其它 (15)