 关于MRP的几个概念 |
ABC Classification ABC分类法 对于库存的所有物料,按照全年货币价值从大到小排序,然后划分为三大类,分别称为A类、B类和C类。A类物料价值最高,受到高度重视,处于中间的B类物料受重视程度稍差,而C类物料价值低,仅进行例行控制管理。ABC分类的原则是通过放松对低值物料的控制管理而节省精力,从而可以把高值物料的库存管理做得更(01/24/2007 16:51:00,1) [查看全文] |
 库位是否参与MRP运算 |
设置库位是否参与MRP预算,可以在IMG:Production -> Material Requirements Planning -(01/07/2007 14:17:12,214) [查看全文] |
What is Discrete Manufacturing, REM and Demand Management? |
What is Discrete Manufacturing, REM and Demand Management? (10/15/2006 17:06:27,118) [查看全文] |
Functions of Production Version |
Functions of Production Version
Can somebody enlighten me on the functions of production version and some tips on its configurati(10/15/2006 17:06:05,128) [查看全文] |
What is Firming Type in the MRP Types |
The firming type dictates the behavior of planning with PTR (Planning Time Fence), i.e whether the system should automatically firm the unfirmed(10/15/2006 17:05:48,117) [查看全文] |
Batch Characteristics while Running MRP |
Can batch characteristics be considered while running a MRP? I have a fin(10/15/2006 17:05:27,82) [查看全文] |
Lose of link between sales order and production order |
Issue with production order confirmation
Due to lose of link between(10/15/2006 17:05:07,98) [查看全文] |
How to Configure Range Of Coverage Profile |
I am trying to configure the range of coverage profile to provide a 6 months safety stock, in which the 'target cov' field should be populated with 180 days, but the that fiel(10/15/2006 17:04:47,117) [查看全文] |
Reservation Not Created During MRP Run |
I have created a planned order thro MRP run, but reservation for raw material is not created, even (10/15/2006 17:04:04,91) [查看全文] |
MRP Monthly lot size |
MRP Monthly lot size
Appreciated if some guide can be provided. MRP lot size has been set to MB (Monthly l(10/15/2006 17:03:37,184) [查看全文] |
[推荐]Planning Strategy Selection |
Planning Strategy Selection
Selection priority for planning strategy is:
First material, second MRP group and last plant parameters. E.g. System first ch(10/15/2006 17:03:13,166) [查看全文] |
Why Planning file entry still Exists? |
Why Planning file entry still Exists?
(10/15/2006 17:02:47,106) [查看全文] |