物料清单  
 fixed[注意]如何获取积分?
首先感谢大家的光临。
本站建立的初衷就是为了给大家提供一个查看文档、交流并共同维护、进步的地方.
现在网站已经初具规模了,为了推动网站的壮大,并加强同行间的交流,对于部分精品进行积分考虑。
具体如下:
1、新注册用户 积分为:10
2、发表文章、上传文件 每篇积分为:5
(12/28/2006 15:09:26,1335) [查看全文]
 *[推荐]100小时学会sap傻瓜式入门版生产计划pp篇
100小时学会sap傻瓜式入门版-生产计划pp篇
(今 20:48,0) [查看全文]
 *BOM详细解析
转发: SAP BOM详细解析
一、产品结构--BOM的重要性
    BOM(Bill of Material) 叫做物料清单,也叫产品结构表、物料表等。
  将产品的原材料、零配件、组合件予以拆解,并将各单项
(今 20:40,0) [查看全文]
 *Deleting a Material BOM
Deleting a Material BOM
(10/02/2007 10:10:34,251) [查看全文]
 *SAP BOM的读取逻辑
1 Search Material, Plant and Material Description.
Read the material number, plant and material description from join of MARA, MARC and MAKT using the following conditions:
(11/05/2006 20:34:11,792) [查看全文]
 *Bill Of Material 物料清单
A bill of material is a complete, formally structured list of the components of a product or assembly.
A bill of material contains the description of e
(11/05/2006 20:17:45,563) [查看全文]
 *What exactly is a Phantom item or Assembly means?
Can anyone plese tell me what exactly is a phantom item or assembly means? 
How does it affect the MRP process? 
A phantom assembly is used when you want to be able
(09/17/2006 21:24:09,231) [查看全文]
 *Multi-level configuration with variants
-----Original Message----- 
Subject: Multilevelconfiguration with variants 
Hi all,
Does anybody know a trick to use preconfigured
variants in mulitilevel configuration ?
(09/17/2006 21:23:44,151) [查看全文]
 *Mass Change Bill of Materials
Use Transaction CS20 to mass change your BOM.
In this transaction code, you can :-
1.  mass change item data
2.  mass delete items
(09/17/2006 21:23:24,160) [查看全文]
 *Allocating BOM to Other Plant
Use Transaction CS07 to link this BOM to the other plants. 
This shall make the BOM available in  the other plants.
(09/17/2006 21:23:02,125) [查看全文]
 *Controlling data for your Bill of Materials
You define the default values for BOM in OS28.
- Based quantity
- BOM Status
- Size Unit
- Var-size item unit
You control the M
(09/17/2006 21:22:37,167) [查看全文]
 *Where used list for BOM
Transaction code : CS15
First screen :
Material     
(09/17/2006 21:22:15,150) [查看全文]
 *Explode BOM
Transaction code : 
CS11 to explode BOM level by level
CS12 to explode BOM Multi level
(09/17/2006 21:21:54,149) [查看全文]
 *Creating a simple BOM
Transaction code : CS01
Material : Your Material code
Plant      : Y
(09/17/2006 21:21:26,119) [查看全文]
 *When is a Material BOM Not Exploded?
A BOM is not exploded in the following situations:
- No BOM is effective:
-- On the explosion date and in the given area of validity 
  For the given effectivity parameters
(09/17/2006 21:20:57,115) [查看全文]
首页 | 前页 | 后页 | 尾页分页 1/1  [1]  
网站搜索:
 
文章分类
生产(PP) (69)
  物料清单 (15)
  需求计划 (24)
  计划订单 (1)
  生产订单 (10)
  其它 (15)